CITI FINANCIAL

CI 190,000 Square Foot Call Center & Computer Room
Owner: Childress Klein
Contractor: Shelco, Inc.
Contract Amount: $5,100,000
Project Started in December 2004
Completed November 2005

This Project was a 195,000 square ft Design Build 3 story call center located in Fort Mill South Carolina. Project consisted of the following:

 

  • 1- 4000 amp 277/480 volt service
  • 2- 1000 kw paralleled Cummins Diesel Generator sets
  • UL listed Lightning Protection system
  • Raised floor Grounding system
  • 2- 400 Kva UPS systems 
  • 6- 150 kva Power distribution units
  • 800- 8 ft indirect fluorescent fixtures 
  • 900- recessed pl fluorescent can lights 
  • 1- Lutron lighting control system for switching and load shedding if required 
  • Site lighting provide with (48) 25 ft poles with 400 watt metal fixtures 
  • Under floor modular wiring system with flush floor boxes in raised floor for wiring to Modular furniture
  • 2500 ft of 24" cable tray under floor for voice Data wiring 
  • Responsible for Securing Design from owners Consultant and securing a qualified subcontractor for the installation of a complete Voice Data System for the Data center and work stations
  • We had an average work force of 15 men peaking at times to 30 men