CITI FINANCIAL
CI 190,000 Square Foot Call Center & Computer Room
Owner: Childress Klein
Contractor: Shelco, Inc.
Contract Amount: $5,100,000
Project Started in December 2004
Completed November 2005
This Project was a 195,000 square ft Design Build 3 story call center located in Fort Mill South Carolina. Project consisted of the following:
- 1- 4000 amp 277/480 volt service
- 2- 1000 kw paralleled Cummins Diesel Generator sets
- UL listed Lightning Protection system
- Raised floor Grounding system
- 2- 400 Kva UPS systems
- 6- 150 kva Power distribution units
- 800- 8 ft indirect fluorescent fixtures
- 900- recessed pl fluorescent can lights
- 1- Lutron lighting control system for switching and load shedding if required
- Site lighting provide with (48) 25 ft poles with 400 watt metal fixtures
- Under floor modular wiring system with flush floor boxes in raised floor for wiring to Modular furniture
- 2500 ft of 24" cable tray under floor for voice Data wiring
- Responsible for Securing Design from owners Consultant and securing a qualified subcontractor for the installation of a complete Voice Data System for the Data center and work stations
- We had an average work force of 15 men peaking at times to 30 men